Image from Google Jackets
Image from OpenLibrary

Evaluation of warning and protective action implementation times for chemical weapons accidents.

By: Contributor(s): Material type: TextTextLanguage: ENG Publication details: 1988Description: 21p., 4 tabs, 9 refsReport number: ORNL/TM-10437Subject(s): Subject: A preliminary evaluation of warning systems and protective action options for off-site emergency planning for chemical weapons accidents. The analysis concentrates on the timing of warning and protective action implementation which is defined as the length of time it will take to protect off-site populations given different warning systems and protective action configurations.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode
Books Books Australian Emergency Management Library BOOK 363.35 SOR (Browse shelf(Opens below)) Available 005278404

A preliminary evaluation of warning systems and protective action options for off-site emergency planning for chemical weapons accidents. The analysis concentrates on the timing of warning and protective action implementation which is defined as the length of time it will take to protect off-site populations given different warning systems and protective action configurations.

Institutional/Corporate Body

1

There are no comments on this title.

to post a comment.

Powered by Koha