Image from Google Jackets
Image from OpenLibrary

A major snow-avalanche episode in northwest Montana, February, 1996.

Material type: TextTextPublication details: Downloaded from the InternetDescription: 5 pDDC classification:
  • 551.307097865 21
Subject: During the evening and early-morning hours of February 8-9 1996, numerous snow avalanches (associated with heavy rains in the Pacific Northwest of the United States) were triggered along the southern boundary of Glacier National Park, Montana. These avalanches buried a portion of U.S. Highway 2 (US2) approximately four miles east of the village of Essex, Montana, as well as the mainline tracks of the Burlington Northern and Sante Fe Railroad (BNRR). US2 is the only east-west link across the Rockies in northern Montana; when closed, a 180-mile detour from East Glacier Park to West Glacier is required. US2 was closed during the evening of February 8 and into the morning of February 9 by snow avalanches blocking traffic. Additionally, approximately 75 yards of track of the BNRR were blocked for about eight hours, shutting down all freight traffic as well as the eastbound Amtrak passenger train from Seattle to Chicago
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)

Includes references

During the evening and early-morning hours of February 8-9 1996, numerous snow avalanches (associated with heavy rains in the Pacific Northwest of the United States) were triggered along the southern boundary of Glacier National Park, Montana. These avalanches buried a portion of U.S. Highway 2 (US2) approximately four miles east of the village of Essex, Montana, as well as the mainline tracks of the Burlington Northern and Sante Fe Railroad (BNRR). US2 is the only east-west link across the Rockies in northern Montana; when closed, a 180-mile detour from East Glacier Park to West Glacier is required. US2 was closed during the evening of February 8 and into the morning of February 9 by snow avalanches blocking traffic. Additionally, approximately 75 yards of track of the BNRR were blocked for about eight hours, shutting down all freight traffic as well as the eastbound Amtrak passenger train from Seattle to Chicago

There are no comments on this title.

to post a comment.

Powered by Koha