Amazon cover image
Image from Amazon.com
Image from Google Jackets
Image from OpenLibrary

2009 Victorian Bushfires Royal Commission interim report 2 : priorities for building in bushfire prone areas.

By: Material type: TextTextSeries: 2009 Victorian Bushfires Royal Commission SerPublication details: Melbourne : 2009 Victorian Bushfires Royal Commission, 2009.Description: 16., 30 cmISBN:
  • 0980740800 (Trade Paper)
  • 9780980740806
DDC classification:
  • 691.82 22
Review: "In August and September 2009, the Commission heard evidence from a range of witnesses, including experts and lay witnesses, about construction of buildings in bushfire prone areas. This evidence explored in detail the designation of bushfire prone areas for the purpose of building controls and the requirements for construction in bushfire prone areas imposed by the Building Code of Australia (BCA), including the development and adequacy of Australian Standard AS3959 ? Construction of Buildings in Bushfire-Prone Areas (AS3959), which is adopted by the BCA. The majority of the issues arising from this evidence will be considered in the Commission?s final report. However, a number of critical matters emerged that require urgent attention, well before the Commission presents its final report in July 2010. On 21 September 2009, the Commission indicated its intention to make interim recommendations on the following urgent issues: the regulation of bushfire bunkers; revision of some aspects of Australian Standard AS3959-2009 ? Construction of Buildings in Bushfire Prone Areas; revision of the Standards Australia Handbook HB36 ? Building in Bushfire Prone Areas." -- p. 4.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode
Books Books Australian Emergency Management Library BOOK 691.82 BUS (Browse shelf(Opens below)) Available 900102683
Books Books Australian Emergency Management Library BOOK 691.82 BUS (Browse shelf(Opens below)) Available 900102691

"In August and September 2009, the Commission heard evidence from a range of witnesses, including experts and lay witnesses, about construction of buildings in bushfire prone areas. This evidence explored in detail the designation of bushfire prone areas for the purpose of building controls and the requirements for construction in bushfire prone areas imposed by the Building Code of Australia (BCA), including the development and adequacy of Australian Standard AS3959 ? Construction of Buildings in Bushfire-Prone Areas (AS3959), which is adopted by the BCA. The majority of the issues arising from this evidence will be considered in the Commission?s final report. However, a number of critical matters emerged that require urgent attention, well before the Commission presents its final report in July 2010. On 21 September 2009, the Commission indicated its intention to make interim recommendations on the following urgent issues: the regulation of bushfire bunkers; revision of some aspects of Australian Standard AS3959-2009 ? Construction of Buildings in Bushfire Prone Areas; revision of the Standards Australia Handbook HB36 ? Building in Bushfire Prone Areas." -- p. 4.

There are no comments on this title.

to post a comment.

Powered by Koha