Evaluation of warning and protective action implementation times for chemical weapons accidents.
Material type: TextLanguage: ENG Publication details: 1988Description: 21p., 4 tabs, 9 refsReport number: ORNL/TM-10437Subject(s): Subject: A preliminary evaluation of warning systems and protective action options for off-site emergency planning for chemical weapons accidents. The analysis concentrates on the timing of warning and protective action implementation which is defined as the length of time it will take to protect off-site populations given different warning systems and protective action configurations.Item type | Current library | Collection | Call number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|
Books | Australian Emergency Management Library | BOOK | 363.35 SOR (Browse shelf(Opens below)) | Available | 005278404 |
Browsing Australian Emergency Management Library shelves, Collection: BOOK Close shelf browser (Hides shelf browser)
A preliminary evaluation of warning systems and protective action options for off-site emergency planning for chemical weapons accidents. The analysis concentrates on the timing of warning and protective action implementation which is defined as the length of time it will take to protect off-site populations given different warning systems and protective action configurations.
Institutional/Corporate Body
1
There are no comments on this title.